HKL upgrades to be done in stages to prevent disruption

0

Upgrades to the Kuala Lumpur Hospital (HKL) will be done in stages to prevent disruption of services, said Health Minister Dzulkefly Ahmad.

Dzulkefly said the upgrades are to elevate HKL’s role as the country’s main public referral hospital and to ensure it could continue to meet the healthcare needs of Malaysians.

Source link

Leave A Reply
Bitcoin (BTC) RM374,429.40
Ethereum (ETH) RM7,092.53
Tether (USDT) RM4.41
BNB (BNB) RM2,611.06
USDC (USDC) RM4.41
XRP (XRP) RM9.22
BUSD (BUSD) RM4.42
Cardano (ADA) RM2.76
Solana (SOL) RM593.87
Dogecoin (DOGE) RM0.693088
Polkadot (DOT) RM16.19
Polygon (MATIC) RM0.809472
Lido Staked Ether (STETH) RM7,095.04
Shiba Inu (SHIB) RM0.000053
Dai (DAI) RM4.41
TRON (TRX) RM1.10
Avalanche (AVAX) RM85.74